Sino-German
Ecopark locates in Qingdao at the coast of the Yellow Sea, it is going
to be a new city district which integrates office and residence
functions and mainly power-supplied by renewable energies.
The
project site has a regular shape, but the topography is complex. It
locates at the back side of the mountain and has a large internal
elevation. There exists a gulch from southwest to northeast. It is at
the gateway of C2 group of Sino-German Ecopark, and close to the German
Center.
Maximizing
conservation and utilization of the original landscape vegetation, by
thorough analysis of vertical planning, separation of pedestrian and
vehicles, urban master planning, aims at maximally improving the
pedestrian environment inside the community and determining the mode of
transportation in the car-free community.
Coordinating
with the neighboring landscape environment and meets the requirement of
the overall architecture form control in the area, a deterministic
distribution of architectural layout in this area is formed. It provides
the spacious landscape courtyard and the simultaneous integration with
the complete spatial form of Sino-German Ecopark.
This
project is an open neighborhood block, the central landscape belt
connects the city green axis and the city park, forming a landscape
corridor. The building land occupation is reduced as much as possible in
the design for the allotted large landscape green space, to increase
the greening rate and the residential quality.
Community
public service functionalities are set up in the east side of the
central sunken landscape, and together with the community center built
in Phase 1, it provides residents of the passive house community as well
as residents from neighboring communities with various public activity
sites.